Solutions · Generators & stationary power

Generators: fuel is most of the cost of every kWh

For standby, prime and industrial gensets, diesel is the dominant lifetime cost. A drop-in enhancer in the day tank lowers it — and cuts the smoke that draws complaints on every test run.

#1fuel is the largest cost of diesel power
5–25%documented savings range across tests
≤500 Lone D50 set covers a large day tank
10 yrsservice life, no maintenance
Diesel generator
01 · Standby

Standby gensets: ready, not thirsty

Test runs add up

Weekly test runs and monthly load tests burn fuel all year even if the grid never fails. Cleaner combustion trims every one of them.

Smoke on start-up

Standby sets smoke on cold starts — visible from the street and the first thing neighbours and inspectors notice. Lower opacity helps.

Fit and forget

A passive unit in the day tank matches the standby philosophy: nothing added to the maintenance schedule.

02 · Prime power

Prime power: litres around the clock

Continuous duty

Prime sets running site power burn fuel every operating hour — the saving compounds around the clock.

Remote sites pay twice

Off-grid operations pay for the litre and for delivering it. Saving fuel also saves logistics.

Verified on the flow meter

Generator fuel is metered, so before/after verification is as clean as measurement gets.

03 · Industrial & rental

Industrial and rental genset fleets

Rental fleets differentiate

A set that burns less and smokes less is easier to place — and cheaper to run between hires.

Sized per day tank

D-Ball to D50/D51 by tank capacity. Large external tanks are specified individually — tell us the capacity.

Emission rules reach gensets

Urban genset emission rules keep tightening; lower smoke keeps older sets working where they are allowed.

05 · Proof

Diesel evidence that transfers

CEE chassis lab

Heavy diesel lab data

Standardized heavy-diesel cycles measured consumption and emission improvements.

DOTARS · 2007

Government testing, Australia

Federal transport department executive summary of device testing.

HK PolyU

University dyno testing

Hong Kong Polytechnic University dynamometer verification of the device.

Full reports and PDF downloads: Proof & Results.

Meter one genset for a month

Install on one set, log the flow meter against the previous baseline, and extend when your own numbers agree.

EN|中文